Thermal salt pool clinic Bad Bentheim, Germany

  

Project description

Specialist planning pool water treatment technology

Demolition of an existing thermal salt pool (water surface: 200 m²)

Construction of a new brine pool with 420 m²

Integration of the existing filter technology in the processing cycle of the new pool. Increase the filtration rate of 20 to 30 m / h.  Evidence of flocculation by particle counting function.

Water surface: 420 m²

Filter performance: 270 m³/h

Flocculation with additional activated carbon stage

Chlorination with chlorine gas

Copyright 2011. Joomla 1.7 templates - Joomla template maker. Ingenieurbüro für Wassertechnik GmbH, Nenndorferstr. 3, 30952 Ronnenberg